Non-Compliance detail


  
Summary
 
Licence number: 4848
Annual Return Start: 17 Aug 2002
Annual Return End: 16 Aug 2003
Date Received: 14 Oct 2003
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L3.1 Weekly analysis of discharge to Murray River showed 1 breach of pH limit, 12 exceedances of TSS limit, 3 exceedances of BOD limit, 5 exceedances of NOx-N limit and 6 exceedances of total N limit. N/A N/A
L3.1 Analysis of weekly samples to Murray River revealed 12 exceedances of Pb limit. N/A N/A
M2.1 Licensee failed to monitor points 8 & 9 as required by the licence N/A N/A
M2.1 Licensee failed to monitor point 11 in accordance witjh the licence. N/A N/A
M2.1 Licensee failed to monitor point 14 in accordance with licence. N/A N/A
M2.1 Licensee failed to monitor points 18 - 21 in accordance with the licence. N/A N/A
M2.1 Licensee failed to monitor points 7, 44-56, 58-60 in accordance with the licence. N/A N/A
M2.1 Licensee failed to monitor point 26 in accordance with the licence. N/A N/A
L3.1 SOx emissions from points 36 & 37 (boiler stacks) exceeded licence limit. N/A N/A
L3.1 Stack sampling results for NOx from point 61 (TNT denitrification scrubber) were in excess of licence limit. N/A N/A